1.
The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is
2.
Critical section for shear in case of flat slabs is at a distance of
3.
Pick up the incorrect statement from the following:
4.
Bulking of sand is maximum if moisture content is about (A) 2 %
5.
For road pavements, the cement generally used, is
6.
The rate of payment is made for 100 cu m (per % cu m) in case of
7.
Pick up the correct statement from the following:
8.
For the construction of buildings, the subheads of the estimate are
9.
The rate of an item of work depends on
10.
The cross-sections for a highway is taken at
11.
The curvature of the earth's surface, is taken into account only if the extent of survey is more than
12.
The difference in the lengths of an arc and its subtended chord on the earth surface for a distance of 18.2 km, is only
13.
In geodetic surveys higher accuracy is achieved, if
14.
Hydrographic surveys deal with the mapping of
15.
Surveys which are carried out to depict mountains, rivers, water bodies, wooded areas and other cultural details, are known as
16.
Surveys which are carried out to provide a national grid of control for preparation of accurate maps of large areas, are known
17.
The main principle of surveying is to work
18.
The inventor of the term soil mechanics, was
19.
Pick up the correct statement from the following :Pick up the correct statement from the following :
20.
Geologic cycle for the formation of soil, is
21.
Chemical weathering of soil is caused due to
22.
Transporting and redepositing soils, is done by
23.
Water formed transported soil is
24.
The ratio of current assets to current liabilities is known as
25.
Which one of the following questions is relevant to the construction estimates?
26.
The construction estimate of a project is used by:
27.
Which of the following theories of mathematics is used by a CAD (Computer Aided Design) software in creating a perspective design?
28.
Site plans shows:
29.
Dimensions in a drawing are to be:
30.
The best drawing paper used for watercolor is:
31.
The public procurement regulation was introduced in ...........BS ?
32.
Nepal Engineering Council publishes the name of registered engineers
33.
The number of clause i.e. Daffa in NEC Act 2055 is ?
34.
A construction schedule is prepared after collecting
35.
Bar charts are suitable for
36.
The first stage of a construction, is
37.
The probability of completion of any activity within its expected time is
38.
Slack time refers to
39.
The most suitable type of equipment for compaction of cohesive soils is
40.
1. Percentage content of silica in window glass, is
41.
2. The type of roof which slopes in two directions with a break in the slope on each side is known as
42.
Wrought iron is used for
43.
Quick lime is (i) Slow in setting (ii) Rapid in slacking (iii) Good in strength
44.
Wrought iron is manufactured from pig iron by
45.
Stucco paints are suitable for A. Stone masonry
46.
In a shaft, the shear stress is not directly proportional to
47.
2. Principle of superposition is applicable when
48.
The Castigliano's second theorem can be used to compute deflections
49.
For stable structures, one of the important properties of flexibility and stiffness matrices is that the elements on the main diagonal (i) Of a stiffness matrix must be positive (ii) Of a stiffness matrix must be negative (iii) Of a flexibility matrix must be positive (iv) Of a flexibility matrix must be negative The correct answer is
50.
Which of the following methods of structural analysis is a force method?